Installation & Commissioning

Turnkey site delivery, hot-cutovers and witness testing.

Overview

From craned-in MSB replacements to staged plant cutovers, our licensed electricians and commissioning engineers handle delivery, termination, primary and secondary injection testing, and client witness handover — under live-site conditions where required.

01 · Service

Cutovers planned to the minute

We treat live-site changeovers as a program, not an event. The week before, we walk every termination, mark every cable, dry-run the sequence, and brief every player. On the night, an ITP drives every step. The result: outage windows that finish on schedule with no surprises.

02 · Service

Commissioning that proves the design

Our commissioning engineers run primary injection through the actual relay logic, not just simulator inputs. We prove trip times against the coordination study, capture residual earth-leakage paths, and hand over a SAT pack that a future asset engineer can actually use.

Scope of work

Built to spec, every line.

  • 01
    Nationally credentialed A-grade electricians
  • 02
    Primary and secondary injection testing (Omicron, Megger)
  • 03
    Hot-cutover and live-site changeover capability
  • 04
    Witness FAT and SAT documentation
  • 05
    JSEA / SWMS, ITP and HAZID-driven execution
  • 06
    24/7 cutover crews for weekend/shutdown windows
Technical specification
Test equipment
Omicron CMC356 / Megger MIT
Insulation testing
Up to 10 kV DC
Primary injection
Up to 6,000 A
Documentation
Full SAT pack, redline as-built
Standards
AS/NZS 3000AS/NZS 3017AS 4836 (working safely)
Featured project

MSB cutover — 24/7 FMCG plant

Truganina, VIC — Replaced legacy 3,200 A MSB during a 36-hour planned shutdown. Zero unplanned outages. Production resumed on schedule.

FAQ

Installation & Commissioning — questions answered

Straight answers from our engineering team. Ask us directly →

Where safe and approved, yes — we hold the documented procedures, JSEAs and PPE controls required for live work to AS 4836. Most jobs are isolated, but we can stage hot-cutovers when production cannot tolerate full shutdown.

We deliver installation and commissioning across NSW, VIC, QLD, WA, SA and TAS — directly with our own crews where licensing requires, and through licensed delivery partners in regional sites.

Yes. A full SAT pack — test results, settings sheets, IR/PI logs, photographs, as-built redlines — is delivered electronically within 5 business days of commissioning.