Installation & Commissioning
Turnkey site delivery, hot-cutovers and witness testing.
From craned-in MSB replacements to staged plant cutovers, our licensed electricians and commissioning engineers handle delivery, termination, primary and secondary injection testing, and client witness handover — under live-site conditions where required.

Cutovers planned to the minute
We treat live-site changeovers as a program, not an event. The week before, we walk every termination, mark every cable, dry-run the sequence, and brief every player. On the night, an ITP drives every step. The result: outage windows that finish on schedule with no surprises.

Commissioning that proves the design
Our commissioning engineers run primary injection through the actual relay logic, not just simulator inputs. We prove trip times against the coordination study, capture residual earth-leakage paths, and hand over a SAT pack that a future asset engineer can actually use.
Built to spec, every line.
- 01Nationally credentialed A-grade electricians
- 02Primary and secondary injection testing (Omicron, Megger)
- 03Hot-cutover and live-site changeover capability
- 04Witness FAT and SAT documentation
- 05JSEA / SWMS, ITP and HAZID-driven execution
- 0624/7 cutover crews for weekend/shutdown windows
- Test equipment
- Omicron CMC356 / Megger MIT
- Insulation testing
- Up to 10 kV DC
- Primary injection
- Up to 6,000 A
- Documentation
- Full SAT pack, redline as-built

MSB cutover — 24/7 FMCG plant
Truganina, VIC — Replaced legacy 3,200 A MSB during a 36-hour planned shutdown. Zero unplanned outages. Production resumed on schedule.
Installation & Commissioning — questions answered
Straight answers from our engineering team. Ask us directly →
Where safe and approved, yes — we hold the documented procedures, JSEAs and PPE controls required for live work to AS 4836. Most jobs are isolated, but we can stage hot-cutovers when production cannot tolerate full shutdown.
We deliver installation and commissioning across NSW, VIC, QLD, WA, SA and TAS — directly with our own crews where licensing requires, and through licensed delivery partners in regional sites.
Yes. A full SAT pack — test results, settings sheets, IR/PI logs, photographs, as-built redlines — is delivered electronically within 5 business days of commissioning.
Build it right the first time.
Send us your scope, single-line, or RFQ. A senior engineer responds within one business day.