Engineering rigour, documented.
Compliance isn't a sticker on a panel door. It's the type-test reference, the ITP, the witness FAT pack, and the protection coordination study.
Audited annually. No exceptions.
Australian standards, type-tested designs.
Low-voltage switchgear assemblies — general rules and power switchgear & controlgear assemblies.
Distribution boards intended for operation by ordinary persons.
Wiring rules — the Australian electrical installation standard.
Selection of cables — cables for AC up to 0.6/1 kV.
Grid-connection of energy systems via inverters — inverter requirements.
Maintenance of electrical switchgear.
Periodic verification of installations.
Electricity network capability — water utility telemetry.
Recommended practice for harmonic control in electric power systems.
From quote to defects close-out.
Design verification
Every design cross-checked against the type-test reference. Protection studies run in ETAP.
Component traceability
Serial-number register against every breaker, contactor and meter shipped.
Witness FAT
Client-witnessed factory acceptance with photo register and signed ITP.
Site SAT
Primary injection testing, secondary verification, signed handover pack.
Download the full BASE capability pack.
Type-test references, ISO certificates, NESMA membership letter, sample ITP, project reference list, and engineering team CVs.
Build it right the first time.
Send us your scope, single-line, or RFQ. A senior engineer responds within one business day.